518 B
518 B
BAT-016 Verification
Status
- Not started.
QC Owner
- dev-reviewer / dev-qc under delivery-runner orchestration.
Required Verification
- REQ-020 AC 1-10 must be verified with direct evidence.
ruff check .must pass.- Full pytest must pass.
- MCP contract/regression and network MCP representative smoke must pass.
- Streamlit AppTest and HTTP smoke must pass.
- DB safety/migration regression must pass.
- Baseline document updates must be inspected.
Verdict
- Pending.
Evidence
- None yet.