Promote REQ-024 and REQ-025 to Implemented after PR #6 merge-backed verification. Mark BAT-018 through BAT-020 as merged and record GitHub Actions evidence.
1.3 KiB
1.3 KiB
BAT-020: Monthly settlement evidence, next actions, documentation, and verification hardening
- Profile: batch-lite
- Status: merged
- Included REQ: REQ-025
- Source Discovery: dcy-015
- Root Delivery: dcy-015_monthly-settlement
- Queue Item: 2
- Created At (KST): 2026-07-12 10:31 KST
Objective
Deliver the final dcy-015 hardening slice by adding read-only evidence/next-action sections, updating supporting baseline docs, and strengthening completed-page verification after BAT-018 and BAT-019 are in place.
Included Scope
- Render 월정산 결과 / Evidence and 다음 액션 sections with explicit read-only wording.
- Update baseline docs that need to describe the read-model/page flow/deferred scope.
- Strengthen dashboard smoke/AppTest/browser evidence as appropriate for the completed page.
Excluded Scope
- Any close persistence, export, MCP summary tool, or other future monthly settlement automation.
- Reopening earlier batch scope unless needed to fix concrete acceptance/test gaps discovered during hardening.
Documents
Delivery Notes
- This slice should not introduce settlement-close writes; it only hardens the read-only page and its evidence trail.
docs/interface-contract.mdchanges remain conditional on an actual contract change; do not edit it by default.