BAT-016 Planning: Review decision persistence and reconciliation workbench

Planning Status

  • Status: completed
  • Profile: standard
  • Design Gate: yes
  • Design Gate Rationale: REQ-020 changes persistence schema, application service contracts, MCP tools, Streamlit UI flow, and operating hub aggregation. A design document is required before implementation.

Objective

Turn REQ-020 into a delivery plan for persisted review decisions and reconciliation sessions without changing existing public contracts destructively.

Work Slices

  1. Persistence foundation
    • Add review decision and reconciliation session schema via additive/idempotent migration.
    • Add service helpers with validation DB coverage.
  2. Application integration
    • Connect cross-transfer review queue, reconciliation report, and uncategorized workbench to persisted decision/session state.
    • Preserve existing response fields with additive extensions only.
  3. Streamlit workbench
    • Add minimal operator actions for record/update/hold/recheck/release.
    • Reflect persisted state in dashboard/workbench counts.
  4. Network MCP surface
    • Add safe read/mutation tools for review decisions and reconciliation sessions.
    • Exclude destructive delete/reset tools.
  5. Baseline and verification
    • Update data model, project structure, runtime flows.
    • Add pytest, MCP surface smoke, Streamlit/dashboard and DB safety evidence.

Acceptance Source

  • REQ-020 Acceptance Criteria 1-10.

Dependencies

  • dcy-013/BAT-015 network MCP endpoint remains the deployment substrate; BAT-016 does not redesign transport.
  • Existing SQLite migration path must remain additive/idempotent.
  • Existing dashboard and MCP consumers must keep their current response fields.

Milestones

  1. Schema + service implementation.
  2. Adapter/UI integration.
  3. Targeted tests and full local regression.
  4. StagePilot artifact update and PR/CI validation.

Risks

  • Source-of-truth ambiguity between current transaction/account state and persisted decision state.
  • Session granularity mismatch across account-level reconciliation and item-level review decisions.
  • Sensitive memo/payload over-storage.
  • MCP/Streamlit contract drift.

Handoff Readiness

  • Ready for design drafting: completed.
  • Ready for implementation: completed after design decisions below.
  • Lead authority needed before delivery: no additional user decision is currently open; scope is approved in dcy-012 and REQ-020.
  • Kanban status: deliberately not used for this recovery path per explicit user instruction.