BAT-020 Planning: Monthly settlement evidence, next actions, documentation, and verification hardening

Planning Status

  • Status: completed
  • Profile: batch-lite
  • Design Gate: no
  • Design Gate Rationale: REQ-025 is a read-only hardening/documentation slice that builds on already-delivered page sections and existing docs/test patterns without introducing new persistence, service contracts, or runtime flow ownership.

Objective

Turn REQ-025 into the final hardening batch for the 월정산 page by adding evidence/next-action sections, updating docs, and strengthening completed-page verification.

Work Slices

  1. Evidence + next actions UI
    • Render close-ready summary, major blockers, source coverage summary, and follow-up hints.
    • Keep wording explicitly read-only.
  2. Baseline document alignment
    • Update docs/project-structure.md and docs/runtime-flows.md.
    • Touch docs/interface-contract.md only if the completed implementation actually changes an internal/external contract.
  3. Verification hardening
    • Expand AppTest/pytest/smoke evidence for the completed page.

Acceptance Source

  • REQ-025 Acceptance Criteria AC-1 through AC-5.

Dependencies

  • BAT-018 / REQ-023 implemented page shell.
  • BAT-019 / REQ-024 implemented operational sections.
  • Existing read-only scope guardrails from dcy-015.

Milestones

  1. Evidence/next-action sections render on the completed page.
  2. Required baseline docs reflect the page flow and deferred scope.
  3. Ruff + pytest and any relevant dashboard smoke evidence pass.

Risks

  • Evidence wording may imply write/close capability that this scope does not implement.
  • Documentation drift may occur if the final UI structure differs from the discovery summary.
  • Over-broad verification edits could spill outside the monthly settlement slice.

Handoff Readiness

  • Ready for implementation: after BAT-018 and BAT-019 completion.
  • Lead authority needed before delivery: no additional user decision is currently open; scope is approved in dcy-015 / REQ-025.
  • Kanban status: deliberately not used.