# BAT-020 Planning: Monthly settlement evidence, next actions, documentation, and verification hardening
|
|
|
|
## Planning Status
|
|
- Status: completed
|
|
- Profile: batch-lite
|
|
- Design Gate: no
|
|
- Design Gate Rationale: REQ-025 is a read-only hardening/documentation slice that builds on already-delivered page sections and existing docs/test patterns without introducing new persistence, service contracts, or runtime flow ownership.
|
|
|
|
## Objective
|
|
Turn REQ-025 into the final hardening batch for the `월정산` page by adding evidence/next-action sections, updating docs, and strengthening completed-page verification.
|
|
|
|
## Work Slices
|
|
1. Evidence + next actions UI
|
|
- Render close-ready summary, major blockers, source coverage summary, and follow-up hints.
|
|
- Keep wording explicitly read-only.
|
|
2. Baseline document alignment
|
|
- Update `docs/project-structure.md` and `docs/runtime-flows.md`.
|
|
- Touch `docs/interface-contract.md` only if the completed implementation actually changes an internal/external contract.
|
|
3. Verification hardening
|
|
- Expand AppTest/pytest/smoke evidence for the completed page.
|
|
|
|
## Acceptance Source
|
|
- REQ-025 Acceptance Criteria AC-1 through AC-5.
|
|
|
|
## Dependencies
|
|
- BAT-018 / REQ-023 implemented page shell.
|
|
- BAT-019 / REQ-024 implemented operational sections.
|
|
- Existing read-only scope guardrails from dcy-015.
|
|
|
|
## Milestones
|
|
1. Evidence/next-action sections render on the completed page.
|
|
2. Required baseline docs reflect the page flow and deferred scope.
|
|
3. Ruff + pytest and any relevant dashboard smoke evidence pass.
|
|
|
|
## Risks
|
|
- Evidence wording may imply write/close capability that this scope does not implement.
|
|
- Documentation drift may occur if the final UI structure differs from the discovery summary.
|
|
- Over-broad verification edits could spill outside the monthly settlement slice.
|
|
|
|
## Handoff Readiness
|
|
- Ready for implementation: after BAT-018 and BAT-019 completion.
|
|
- Lead authority needed before delivery: no additional user decision is currently open; scope is approved in dcy-015 / REQ-025.
|
|
- Kanban status: deliberately not used.
|